This tip as provided by a customer via our user forum (http://www.softree.ca/support/forum.htm).
He wrote:
One type of road we see that needs attention is the older side-cast
constructed road with the overly steep shoulder fill. These roads often
have a tension crack showing up on the outside wheel track. We typically
want to retrieve this side-cast material, haul it to a disposal site and
move the road alignment into the hill or just live with a narrow road.
Here we will stabilize the oversteepened fill, find out how much volume
must be removed and what the finished cross sections will look like.
- Survey the road keeping track of the location of the toe of fill. If
you are doing a centerline with cross sections style of survey, then
put the centerline at the toe of fill. If you are doing a radial or
topographic style of survey then be sure to survey and label points on
the toe of fill.
- Create a P-Line in the Survey/Map module with your survey. A
centerline with cross sections survey can be directly typed into the
Survey/Map module.
A topographic survey must be imported into the Terrain module and
triangulated (Edit-Calculate Terrain Model), Road edges,
top of cut and toe of fill features should be breaklines to make the
best model possible. Breakline (and other) features can be imported
directly from the survey (ASCII or DXF) or they can be created later
using the Edit-Digitize/Draw New Feature function. The View-Plan
Options- Snap to Point option makes it easy to connect
surveyed points into a feature.

After the model is created, the toe of fill feature must be exported
to a Softree-Traverse Document with side shots (File-Export
Feature(s)); use the options button to select side shot extension.
- Go to the Location Module and create a new design with the new
P-Line.
- Edit the default Template to have a very small road width and no
ditches. Leave the final slopes at Auto.
- Set the cut slope for the surveyed ground type to the stabilized
pull back slope. Set the fill slope to a large value. (The ground type
for a file exported from Terrain will be OB).
- The design is complete. The default location of your
"road" is on the P-Line (which is the toe of fill. The cut
from there up to the road surface is the stabilized pull back slope;
there will be no fill because the fill slope is large. View your cross
sections and look at the mass haul for volumes.


|
|